Central Park School, NYC

Categories

Floor Epoxy

In a nutshell, epoxy flooring is a type of synthetic resin floor system that is laid on top of concrete substrates as a form of protection and decoration. The systems can comprise of several layers of thermosetting resin that are coated, trowelled or poured, and generally applied onto a concrete substrate.

Waterproofing Systems

Waterproofing Systems is a process that ensures a seamless system is established through the application of elastic and durable membranes. It is a technique used in the construction and design industries to curb the effect of environment liquid penetration into systems.

Floor Hardener

Floor hardener is a particle form made by mixing cement with grit/stone chips mixture to increase hardness and durability to the concrete floor without affecting cement chemistry. Additionally, a floor hardener is also used to prevent floors from wearing out prematurely.

Floor Polishing Concrete

Polished concrete is a multi-step process where a concrete floor is mechanically ground, honed and polished with bonded abrasives in order to cut a concrete floor's surface. It is then refined with each cut in order to achieve a specified level of appearance.

Central Park School, NY

The school board was facing a $500,000 to $600,000 cost to replace the entire HVAC system due to difficulty in maintaining and repairing the existing system. Contractors claimed that the obsolescence of parts and aging systems allowed no other option. Classroom temperatures ranged from 64 to 78 degrees.

Challenge

Contractors claimed that the obsolescence of parts and aging systems allowed no other option. Room temperatures ranged from 64 to 78 degrees.

Solution

Air Pro Experts proposed an all-inclusive, fixed-cost service agreement to assume the responsibility for preventative maintenance, repairs and equipment replacement for a fraction of the cost.

CLIENT:
Central Park School

CONTRACTOR:
Air Pro Experts

PROJECT DURATION:
January 2016 – May 2016

CONTRACT AMOUNT:
$28000.00